Scuderia Fans

  • News
  • Current Drivers
    • Charles Leclerc
    • Lewis Hamilton
  • Races
    • 2026 F1 Hungarian Grand Prix
    • 2026 F1 Dutch Grand Prix
    • 2026 F1 Italian Grand Prix
    • 2026 F1 Spanish Grand Prix
    • 2026 F1 Azerbaijan Grand Prix
    • 2026 F1 Bahrain Grand Prix
    • 2026 F1 Singapore Grand Prix
    • 2026 F1 United States Grand Prix
  • Formula 1 Statistics
  • Ferrari F1 World Champions
    • Michael Schumacher
    • Kimi Raikkonen
    • Niki Lauda
    • Jody Scheckter
    • John Surtees
    • Phil Hill
    • Mike Hawthorn
    • Juan-Manuel Fangio
    • Alberto Ascari
  • Former Ferrari drivers
    • Sebastian Vettel
    • Felipe Massa
    • Fernando Alonso
    • Gilles Villeneuve
    • Jean Alesi
    • Alain Prost
    • Nigel Mansell
    • Gerhard Berger
    • Mario Andretti
    • Rubens Barrichello
    • Michele Alboreto
    • Patrick Tambay
    • Eddie Irvine
    • Rene Arnoux
    • Didier Pironi
    • Jacky Ickx
    • Carlos Reutemann
    • Clay Regazzoni
    • Stefan Johansson
    • Arturo Merzario
    • Giancarlo Fisichella
    • Carlos Sainz
  • Ferrari WEC
  • F1 TICKETS
  • Advertise with ScuderiaFans
  • Ferrari F1 Shop
  • Home
  • Formula 1 Schedule & Results
  • Formula 1 Driver Standings
  • Formula 1 Constructor Standings
  • Contact us
Home » German media reports Ferrari and Red Bull are behind schedule with 2026 F1 engine

German media reports Ferrari and Red Bull are behind schedule with 2026 F1 engine. Ferrari and Red Bull reportedly face delays in developing their 2026 Formula 1 engines.

It was the dominant Formula 1 topic in recent weeks. Several manufacturers wanted to overturn the new engine regulations for 2026. After F1 CEO Stefano Domenicali himself floated the idea of a V10 engine with synthetic fuel as an alternative for the future and FIA President Mohammed bin Sulayem jumped on the bandwagon, Red Bull and Ferrari wanted to seize the opportunity.

The two heavyweights of the premier class fought against the new power unit that is coming to Formula 1 in 2026. The electric share will increase significantly: almost half of the power is to be delivered by the battery, with the rest coming from the V6 turbo. Officially, the teams voiced safety concerns to the FIA. The longer recuperation phases could lead to large speed differences and create dangerous situations.

Other voices in the paddock, however, saw a different motivation behind the moves. Ferrari and Red Bull are reportedly behind in the development of the new engine for 2026. It is rumored that Mercedes is well on its way to delivering the best power unit, similar to 2014. Back then, the engine builders in Brixworth had designed the transition to the complex current generation power units best and had Formula 1 in a stranglehold for several years.

No changes to energy split planned
The first setback for the opponents of the new regulations came at the Bahrain Grand Prix. At a meeting of all engine manufacturers, Ferrari and Red Bull were rejected in their request to quickly reintroduce the desired V10 naturally aspirated engine into the cars. Newcomer Audi, returnee Honda, and Mercedes would not have been able to develop a different engine at such short notice.

Add ScuderiaFans.com as your preferred Google News source for Formula 1 updates

But the opposition did not give up. They wanted to relax energy split management. On Thursday (April 24), however, Ferrari and Red Bull, who are developing their own combustion engine for the next season and are supported by Ford on the electric side, suffered their next defeat. The Formula 1 Commission rejected the proposal to change the distribution between combustion engine and battery. The plan had been to reduce the 350 kW on the electric side to 200 kW during races. The rest of the power would have had to come from the 1.6-liter V6 turbo engine, as reported by German automobile magazine Auto Motor und Sport.

Mercedes team boss Toto Wolff was angered by his opponents’ efforts ahead of the meeting. “I actually wanted to protect ourselves and not comment on it. But this is really a joke. Only a week ago we had a meeting about the engines. And now these things are already back on the agenda.” For now, the Austrian can breathe a sigh of relief. The new regulations will be given a chance for the time being.

Backdoor remains open
The official FIA statement reads: “The F1 Commission discussed potential improvements to the energy management strategy for 2026 as well as measures to address financial issues that engine manufacturers could face if either performance deficits or significant reliability issues occur in 2026. All these topics will be discussed in more detail by specialists in the appropriate advisory committees.”

Ferrari F1 merchandise

With this decision, the premier class has taken precautions. Should there be major performance differences on the racetrack next year, there would be possibilities to make adjustments in the interest of the sport. If manufacturers fall significantly behind, they would likely be allowed to exceed the engine budget cap and receive more test bench hours.

Ferrari F1 power unit

Apr 26, 2025David Carter
Click here to set ScuderiaFans.com as your preferred Google Discover source and find our content more easily!
Understanding Lewis Hamilton’s Ferrari issues – and why they won’t be solved overnightEscape game: Lewis Hamilton and Charles Leclerc tackle Ferrari logistical challenges [video]
Comments: 2
  1. Toriks
    1 year ago

    I don’t believe it.

    ReplyCancel
  2. John
    1 year ago

    Hamilton probably made the blunder of lifetime to leave Mercedes and join Ferrari. Ferrari is a lost cause. Last year they had a car on par with Mclaren. Few months later, they have an unreliable tractor.

    ReplyCancel

Leave a Reply Cancel reply

David Carter

David Carter is a ScuderiaFans editorial byline for race-weekend analysis, strategy and Ferrari performance. His coverage examines the decisions and developments that shape each Grand Prix.

1 year ago 2 Comments News2025 Formula 1 season, Red Bull, Scuderia Ferrari1,047
Next F1 race
0 Days
00 Hours
00 Mins
00 Secs
RACE DAY
until lights out
Gear up with Ferrari merchandise!
Buy official Ferrari 2026 F1 products
2026 Formula 1 calendar

Complete 2026 Formula 1 calendar with all Grand Prix dates and locations

Latest Ferrari technical analysis
Charles Leclerc, Ferrari SF-26 pit stop, Pirelli tire, 2026 F1
Was Ferrari’s Mexico performance a one-off? The technical clues suggest something more
12 hours ago
Lewis Hamilton, Ferrari SF-26, sidepods, 2026 F1
Ferrari SF-26 at Brazilian GP: Why Interlagos offers a chance to overcome engine weakness
15 hours ago
Charles Leclerc, Ferrari SF-26 sidepods, 2026 F1
Ferrari F1 analysis: Why the SF-26 is improving after Austin and Mexico
2 days ago
Charles Leclerc, Ferrari SF-26 sidepods, floor, 2026 F1
Ferrari’s 2026 upgrades could hold the key to a major 2027 F1 breakthrough
5 days ago
Ferrari SF26 tire, power unit, engine, rear wing, garage, 2026 F1
Ferrari’s reduced turbo lag boosts Mexico GP pace, but power deficit raises qualifying questions
6 days ago

Latest articles

  • Formula 1’s fiercest team-mate rivalries: from Hamilton and Leclerc to Senna and Prost
  • 6 Hours of Monza: Ferrari, Alpine and Toyota analysed after rain-affected Friday practice
  • Is Ferrari finally listening to Lewis Hamilton? Stefano Tamburini reveals the price he has paid
  • 2026 Brazilian GP technical preview: Why Ferrari’s tyre management could be decisive
  • Is the Ferrari civil war finally over? What happened behind closed doors at Interlagos?
Partners
Betwinner

non-GamStop casinos

best online casinos not on GamStop

bwacademy

magyarkaszinooldalak

GP-News - latest F1 news updates

The most accurate sports predictions and latest news available on TipsGG

1Win

no deposit casinos at GHZD Betpack Mostbet Pakistan australiacasinopokies top canadian casinos

Formula 1 News

Guitar Junky

Best Intraday Tips

Contact Center Company

SilverArrows.Net - Mercedes F1 news

TopSpeed

Esports Forum

Racing Statistics

Fixture Calendar

Live F1 Results

You can find reel-based games without download or registration via free slots on Slotozilla

Uusia Nettikasinoita
Thailand Walking Street

de bedste odds uden ROFUS på Leadership.ng

Get In Touch With Us

  • Advertise with ScuderiaFans
  • Contact us
  • Corrections Policy
  • Editorial Policy
  • Privacy Policy
  • Support ScuderiaFans.com

Meet the team

  • About us
  • Our writers
  • Formula 1 Circuits
  • 2026 Formula 1 Calendar
  • Formula 1 Statistics & Analysis
  • Ferrari F1 FAQ

© 2016–2026 Scuderia Fans Ltd. All rights reserved.

Scuderia Fans Ltd.
199 Republicii Street, 5A
Ploiesti, Romania, 100392
2016 © Scuderia Fans